Located in the southern coastal area of Shenzhen OCT, Shenzhen Bay Super Headquarters Base is a core segment of the Tanglang Mountain-OCT- Shenzhen Bay urban functional space axis. It adjoins Shenzhen Bay on the south, overlooking Hong Kong across the sea, the inner lake wetland of OCT on the north, Sand River golf course on the west, and OCT Harbor on the east. Urban railway Line 2, 9 and 11 (airport express line) intersect here, making it an area with unique natural landscape, prominent urban gateway image and high value of integrated urban development in the future.
The core area in the planning, enclosed by Bin Hai Da Dao, Shen Wan Yi Lu, Shen Wan Wu Lu, Bai Shi San Dao, and Bai Shi Lu, covers 117 hectares of land.
深圳湾超级总部基地城市设计优化国际咨询核心范围
Core Area of International Consulting for UrbanDesign Optimization of Shenzhen Bay Super Headquarters Base
This request for international consulting is open to design firms worldwide and future-oriented. With a vision to create a masterpiece of world-class urban cluster in Guangdong-Hong Kong-Macao Greater Bay Area, it requests design firms to refine and detail the original planning deliverables and achieve the goal of developing Shenzhen Bay into an intensive, efficient, ecological and people-oriented "future city". Systematic design of the layout structure, development strength, functional composition, public space, underground space, architectural style, ecological landscape, urban skyline, integrated transportation, smart city etc. is required to strengthen delicacy planning control of spatial form and guide effective, scientific and orderly planning, construction and operation management of the area.
3 报名要求 Registration Requirements
本次国际咨询不设资质要求,国内外设计机构均可报名参加,接受联合体报名,不接受个人名义报名。
This request for international consulting is open to all international and local design firms or consortiums. Individual participation is not acceptable.
This request for international consulting will include three stages, namely prequalification, design evaluation and deliverables consolidation.
This request for international consulting is open to all design firms worldwide. The prequalification committee will assess the registered design firms and select 15 preferred design firms for the next stage of schematic design. The jury will evaluate the design deliverables submitted by these firms and select 3 winners; the Construction Headquarters of Shenzhen Bay Super Headquarters Base will review the three winning proposals and finalize a 1st place to detail and refine the urban design deliverables of Shenzhen Bay Super Headquarters Base in collaboration with the technical service provider, and will submit the refined deliverable to the Construction Headquarters of Shenzhen Bay Super Headquarters Base for approval. The Organizer will organize 3 to 4 workshops afterwards, and the 3 winning design firms should send their chief designers to participate in the workshops.
时间安排详见下表:
Time schedule:
时间
Deadline
事项
Activities
第一阶段 资格预审
Stage 1 Prequalification
2018年8月24日
Aug.24, 2018
发布国际咨询预公告
Release pre-announcement on request for international consulting
2018年8月31日
Aug.31, 2018
发布正式公告及咨询要求
Release official announcement and requirements
2018年9月10日
Sep.10, 2018
提交电子报名资料,报名截止
Deadline for submitting electronic registration materials
2018年9月14日
Sep.14, 2018
提交纸质报名资料(本次咨询以收到纸质报名材料为准)
Submit paper registration materials (the effectiveness of registration is subject to the receipt of the paper documents)
2018年9月21日
Sep.21, 2018
由资格预审委员会对报名材料进行资格预审,择优选取15家设计机构入围
The Prequalification Committee assesses the registration materials and select 15 preferred design firms.
2018年9月21日
Sep.21, 2018
公布资格预审结果,发出入围通知书及技术任务书
Announcement of prequalification results and distribution of prequalification notice and technical design brief
第二阶段 方案评审
Stage 2 Design Evaluation
2018年10月10日
Oct.10, 2018
组织踏勘、答疑
Site visit and Q&A
2018年11月16日
Nov. 16, 2018
提交设计成果
Submission of design deliverables
2018年11月20日
Nov. 20, 2018
召开方案评审会
Design evaluation meeting
2018年11月21日
Nov.21, 2018
公布方案评审结果
Announcement of evaluation results
2018年11月下旬
Late Nov., 2018
公布第一名设计机构
Announcement of the 1st place
第三阶段 成果整合
Stage 3 Deliverables Consolidation
2018年12月-2019年3月
Dec. 2018- March, 2019
成果深化完善
Deliverables detailing and refining
注:上表为北京时间,主办方保留调整日程安排的权利。
Notes: All the time and dates are shown in Beijing Time. The Organizer reserves the right to adjust the schedule.
The rewards of this task are as follows:
First place (1): RMB 4 million (including schematic design, deliverables detailing and refinement, workshop related expenses);
Second place (2): RMB 3 million each (including schematic design and workshop related expenses);
Other finalists (12): RMB 800,000 each (schematic design fees).
Organizer:Shenzhen Bay Super Headquarters Base Construction Project Office
Co-Organizer:Shenzhen Investment Holdings Co., Ltd.
Technical Support: China Urban Planning & Design Research Institute
Organizing Consultant: Shenzhen Center for Public Art (Shenzhen Center for Design)
Announcement release website: Shenzhen Construction Project Transaction Service Center
(http://www.szjsjy.com.cn)